Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

Product Details
Customization: Available
Warranty: 1 Year
Product Type: PE Water-supply Pipes
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
155
Year of Establishment
2012-04-09
  • Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
  • Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
  • Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
  • Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
  • Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
  • Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
Find Similar Products
  • Overview
  • Product
  • Company Profile
  • Our Advantages
  • Packaging & Shipping
  • Certifications
  • Exhibitions
  • FAQ
Overview

Basic Info.

Model NO.
JW45; JW60; JW75; JW90; JW120
Automation
Automatic
Computerized
Computerized
Certification
CE, ISO9001:2008, SGS
Customized
Customized
Condition
New
After-sales Service
1 Year
Contactor
Shneider
Motor
Beide Siemens
Inverter
ABB Brand
Temperature Control
Omron
Gear Box
Guomao Brand/Flender
Control
PLC+Touch Screen
Suitable Material
PE
Pipe Diameter
16-1600mm
Packing
Wooden Cases
Final Product
Plastic Pipe
Usage
Water Supply and Drainage
Keywords
Pipe Machinery
Advantages
Energy Saving/High Speed
Transport Package
Wooden Cases
Trademark
Jwell
Origin
China
Production Capacity
250-1800kg/H

Packaging & Delivery

Package Size
6000.00cm * 3000.00cm * 2500.00cm
Package Gross Weight
10000.000kg

Product Description

Product

Applications

Drinking water delivery,Hot and cold water transport,The floor heating,The central heating on the residential and Industrial transportation (chemical liquid and gas) Special applications. (underwater networks, electro chemical corrosion risk high network, etc.)

Descriptions
Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production
The production line is mainly used two extruders making two layers (adjustable in proportion) or two extruders making three layers (adjustable inside and outside walls) or three extruders making three layers (adjustable inside and outside walls) multifunctional polyethylene water supply and drainage pipe.

The modern developed 2-layer, 3-layer and multi-layer spiral mould is specially for special-application pipe extrusion. This pipe with even and equal co-extrusion wall thickness, the inner and outer wall made of double-anti material (Anti-flammable, anti static electricity), the core layer made of HDPE, sharply reduce the cost of double-anti material, then reduced the cost of the whole production line

Specifications

Type Pipe spec(mm) Extruder Max.capacity(kg/h)
JWPE-63 16-63 JW60/JW45 250-360
16-63 JW60/JW45x2 250-360
JWPE-110 20-110 JW60/JW45 300-440
20-110 JW60/JW45x2 300-440
JWPE-160 50-160 JW60/JW45 360-520
50-160 JW60/JW45x2 360-520
JWPE-250 75-250 JW75/JW45 500-600
75-250 JW75/JW45x2 500-600
JWPE-315 110-315 JW75/JW45 550-650
110-315 JW75/JW45x2 550-650
JWPE-500 200-500 JW90/JW45 650-800
200-500 JW90/JW45x2 650-800
JWPE-630 315-630 JW90/JW50 1000-1200
315-630 JW90/JW50x2 1000-1200
JWPE-800 400-800 JW90/JW60 1000-1400
400-800 JW90/JW50x2 1000-1400
JWPE-1000 500-1000 JW90/JW75 1000-1400
500-1000 JW90/JW60x2 1000-1400
JWPE-1200 630-1200 JW120/JW60 1100-1600
630-1200 JW120/JW60x2 1100-1600
JWPE-1600 1000-1600 JW120/JW90 1250-1800
1000-1600 JW120/JW75x2 1250-1800

Process Steps
Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

Company Profile

Jwell was founded in 1997, China Plastics Machinery Industry Association vice president unit, plastic extrusion equipment, chemical fiber spinning complete sets of equipment manufacturers. The production bases of Jwell company cover about 7,000,000 square meters and are consisted with 7 parts, which are located in Jiading district of Shanghai where the head office of the company locates, Haining and Zhoushan City of Zhejiang Province, Taicang City and Liyang City of Jiangsu Province, Foshan City of Guangdong Province and Thailand. The company has 26 professional companies and nine large-scale gold processing plants and three heat treatment nitriding plants, with an annual output of 3000+ sets of high-grade plastic extrusion production lines and other complete sets of equipment, marketing in more than 120 countries and regions.

Jwell has a high-quality team and an experienced team of mechanical and Electrical Commissioning Engineers, as well as an advanced machining base and Standard Assembly Workshop.

Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion ProductionJwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion ProductionJwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion ProductionJwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

Our Advantages

Workshop Processing

Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion ProductionQuality Control
Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion ProductionGlobal Service and Training

Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

Packaging & Shipping

Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

Certifications

Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

Exhibitions

Jwell HDPE High Speed Multi-Layer Co-Extrusion Water Supply and Drainage Pipe Extruder HDPE LDPE PPR Plastic Water Gas Oil Supply Pipe Tube Extrusion Production

FAQ

Q1. What about the payment way?
A1. By TT, L/C at sight. 30% down payment should be paid after contract is valid, 70% balance should be paid before shipment.

Q2. Installation and stuff training available from you?
A2. Yes, we have rich engineers around the world which can send to your factory and train your workers. Also we can online guide your members.

Q3. How long is the guarantee?
A3. We offer you high quality machines with 12 months guarantee and reply you as soon as possible within 6 hours.

Q4. If the machine some parts is broken one day, how can we get help from you?
A4. We will send you spare parts free of charge If they are in warranty, not including easy-broken parts. For easy-broken parts, we will only charge a cost fee.

Q5.How does your factory do regarding quality control?
A5.We have passed the IS09001:2000 Quality Management System and CE certificate and we have a special QC department in charge of products' quality. If you also need other certificates, we also can help to apply.

Q6. What is your packaging?
A6. Our conventional packaging is: After doing the anti-rust treatment, wrap the plastic film around the machine and then fix the machine on the wooden bracket.

Q7. How can we check the machines before delivery?
A7. We can provide online checking when testing the machine on site. We will take and prepare detailed testing videos for your checking before the delivery. We accept third-party testing. Except above points,we will provide detailed testing report.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed